Project description
Sinoacme HT Prefabricated Steel Structure Industry Zone
HT Prefabricated Steel Structure Industry Zone is an industrial park that we built in a total of 4.5 months from start of communication to completion of production. The total area is 100,000 square metres. It is one of the largest construction projects we have undertaken to date. Both in terms of area and construction time. By communicating with our technical staff, the client was able to quickly define the construction plan and determine all the custom components needed to implement the operation of the building that the client required. Our prefabricated metal building has a clear frame structure, enabling a large span column-free structure.
Benefits of metal buildings
Low maintenance: the construction is completed with virtually no maintenance required
Low cost of construction: the metal building costs around 30% less to build than a concrete building
Long life span: the steel structure is custom designed to suit the client’s requirements and the climate and can last up to 50 years
Greater flexibility: the building can be retrofitted and upgraded at a later stage without affecting the overall structure and can be adapted to meet any retrofit requirements.
Fast construction: the faster the construction, the less it costs, both in terms of labour and time. Most of our work is done in the factory, avoiding the impact of weather on the construction schedule.
Project details
- Project: Prefabricated Steel Structure Industry Zone
- Category: Workshop
- Client: HT